Traffic Conditioning

 VIAEXPRESSO hereby informs you that the following work will be carried out, involving traffic disturbance (cut-off of a road), next week ( May 31 to June 6, 2020):

KM – VE Date – Period Way – Via Jobs
Between the km 8+450 and 9+130 of VE1
(Cruz tunnel)
May 31, nightime Both senses Cleaning of drainage system
Between the km 2+800 and 5+250 of VE3 May 26 to june 6, daytime/nightime Both senses
(*)
Repair
Between les km 7+690 et 9+300 of VE4
(Encumeada tunnel)
May 31 to june 5, nightime São Vicente >
Ribeira Brava (Decreasing)
Renewal of SCV equipment
Between the km 6+340 and 6+460 of VE1
(Serrado tunnel)
June 1 to 3, daytime Both senses Cable path replacement
Between the km 16+200 and 16+800 of VE1 June 1 and 2, daytime Machico > São Jorge (Crescent) Remodeling and expansion of water supply and drainage networks
Between the km 2+400 and 2+700 of VE2 June 1 au 5, daytime Porto Moniz > São Vicente
(Decreasing)
Construction of buildings technician
Between the km 16+300 and 16+500 of VE3 June 1 to 3, daytime/nightime Both senses Substitution of expansion joints
Between the km 2+775 and 4+925 of VE1
(Norte tunnel)
June 1 to 5, nightime São Jorge > Machico
(Decreasing)
Renewal of SCV equipment
Between the km 8+450 and 9+130 of VE1
(Cruz tunnel)
June 1 and 2, nightime Both senses Wall washes
Between the km 11+550 and 12+450 of VE2
(Casaistunnel)
June 1 to 4, nightime São Vicente > Porto Moniz
(Crescent)
Maintenance of ventilation equipment
Between the km 2+350 and 2+740 of VE3
(Ribeira Brava/Tabua tunnel)
June 1 to 4, nightime Both senses Cable path replacement
Between the km 2+900 and 7+000 of VE3
(Ponta do Sol/Madalena do Mar tunnel)
June 1 to 4, nightime Ribeira Brava > Raposeira (Crescent) SCV maintenance
Between the km 4+600 and 5+100 of VE2
(João Delgado tunnel)
June 2, daytime São Vicente > Porto Moniz
(Crescent)
Repair in the electricity grid
Between the km 7+450 and 8+000 of VE1
(Achada tunnel) 
June 3, nightime Both senses Wall washes
Between the km 8+450 and 9+130 of VE1
(Cruz tunnel)
June 4 and 5, daytime Machico > São Jorge (Crescent) Cable path replacement
Between the km 13+000 and 13+350 of VE3 June 4 and 5, daytime/nightime Both senses Substitution of expansion joints
Between the km 14+450 and 15+025 of VE1
(Rochedo do Navio tunnel and Santana tunnel)
June 4, nightime Both senses Cleaning of drainage system
(*) Closure of circulation in both directions between 09:30 am on may 31 and 24:00 on june 6 2020.